Smart logistics (schedule design, supply chains, logistics, manufacturing systems)

Back

Cahiers du GERAD

773 results — page 3 of 39

, , , , , and

Crew pairing problems (CPP) are regularly solved by airlines to produce crew schedules. The goal of CPPs is to find a set of pairings (sequence of flights a...

BibTeX reference

Personnel scheduling consists in determining employee work schedules (sequences of work shifts and days off) to cover the demands of multiple jobs over a pl...

BibTeX reference
, , , and

We study an integrated multi-product production and distribution problem considering a network of multiple plants and customers, who are geographically dispe...

BibTeX reference
, , , and

We study a staffing optimization problem in multi-skill call centers. The objective is to minimize the total cost of agents under some quality of service (Q...

BibTeX reference

The procurement of freight services is an important element for the supply chain management of a shipper (i.e., a manufacturer or retailer) that sources tran...

BibTeX reference
and

Faster delivery, lower shipping costs, and a higher chance of product availability, are some of the benefits offered by an omnichannel business model. Assumi...

BibTeX reference
, , and

Every component of an electric power system is susceptible to failure. The power transmission system connects generating units to local distribution systems,...

BibTeX reference

The simultaneous stochastic optimization of mining complexes (SSOMC) is a large-scale stochastic combinatorial optimization problem that simultaneously manag...

BibTeX reference
, , , , and

We study a predisaster relief network design problem with uncertain demands. The aim is to determine the prepositioning and reallocation of relief supplies. ...

BibTeX reference
, , , and

In most Swiss municipalities, a curbside system consisting of heavy trucks stopping at almost each household is used for non-recoverable waste collection. Du...

BibTeX reference
, , and

Column generation is an iterative method used to solve a variety of optimization problems. It decomposes the problem into two parts: a master problem, and on...

BibTeX reference

In this paper, we study a distributionally robust multi-item newsvendor problem, where the demand distribution is unknown but specified with a general event-...

BibTeX reference
, , , and

Production yield can be highly volatile and uncertain, especially in industries where exogenous and environmental factors such as the climate or raw material...

BibTeX reference

The Tenth Montreal IPSW took place on August 13-27, 2020, and was jointly organized by the Centre de recherches mathématiques (CRM) and the Institute for Dat...

BibTeX reference
and

This paper studies a stochastic variant of the vehicle routing problem (VRP) where both customer locations and demands are uncertain. In particular, potentia...

BibTeX reference
, , , and

Binary quadratic programming (BQP) is a class of combinatorial optimization problems comprising binary variables, quadratic objective functions and linear/no...

BibTeX reference

A new linear model is presented herein to optimize strategic production scheduling of an open pit mine with multiple processing streams while accounting for...

BibTeX reference
and

Geostatistically simulated representations of mineral deposits are used for resource/reserve assessments, mine design and production planning, project evalua...

BibTeX reference
, , and

Industrial mining complexes can be optimized using simultaneous stochastic optimization (SSO), which manages the risks associated with meeting production tar...

BibTeX reference

This paper presents a new truck dispatching policy approach that is adaptive given different mining complex configurations in order to deliver supply materia...

BibTeX reference