Back

Session WA6 - Logistique II / Logistic II

Day Wednesday, May 9, 2007
Room St-Hubert
Chair Bernard K.S. Cheung

Presentations

10h30 AM-
10h55 AM
Development of a RFID/GPRS/IT Enabled Information/Knowledge Based Integrated Distribution Decision Support System
  Bernard K.S. Cheung, GERAD et École Polytechnique de Montréal, CIRRELT, C.P. 6079, Succ. Centre-ville, Montréal, Québec, Canada, H3C 3A7
C.K. Chan, Hong Kong Polytechnic University, Department of Applied Mathematics
K.L. Choy, Hong Kong Polytechnic University, Department of Industrial and Systems Engineering
Edmond L.H. Choy, Hong Kong Polytechnic University, Department of Industrial and Systems Engineering
Esmond C.M. Mok, Hong Kong Polytechnic University, Department of Land Surveying & Geo-Informatics
Kenneth T.C. Poon, Hong Kong Polytechnic University, Department of Industrial and Systems Engineering
Q. Wang, Hong Kong Polytechnic University, Department of Industrial and Systems Engineering

With the advances in IT technology and its related tool, full visibility on the movements of manufactured goods within the distribution system starting from supplier (or producer) to the end customers can be attained, this presents great challenge for the development of an efficient distribution system that minimizes the overall operation time and the total inventory in all the warehouses (or distribution centres). Recently there have been articles on RFID/GPRS/IT enabled dynamic vehicle routing, virtual warehousing and replenishment schemes that take care of both the fluctuating customers’ demands and flow of returned goods. However, there has not been any proposed Decision Support System that integrates both the warehousing and delivery operation of the complete distribution system under full visibility provided by these modern technologies.


10h55 AM-
11h20 AM
Règles pour la prise de rendez-vous pour une clinique dentaire
  Vanessa Armendáriz, École Polytechnique de Montréal, Mathématiques et de génie industriel, C.P. 6079 Succ. Centre-ville, Montréal, Québec, Canada, H3C 3A7
Diane Riopel, GERAD et École Polytechnique de Montréal, Département de mathématiques et de génie industriel, C.P. 6079, Succ. Centre-ville, Montréal, Québec, Canada, H3C 3A7
Blanca Pérez-Gladish, Universidad de Oviedo, Fac. CC. Económicas y Empresariales, Avda. del Cristo, Oviedo, Espagne, 33006

Ce travail analyse les outils et les méthodes utilisées dans l’industrie manufacturière pour les adapter à l’industrie de services, particulièrement pour les problèmes d’ordonnancement. Le cas d’une clinique dentaire est analysé. La contribution de ce travail est de fournir des règles à suivre par les préposés à la prise de rendez-vous qui respectent les soucis de minimisation du temps d’attente du patient et d’inoccupation des ressources en prenant en compte l’affectation dynamique du dentiste et des hygiénistes aux différentes activités. Le modèle de simulation développé évalue deux critères selon différents scénarios, le premier est la gestion efficace des membres du personnel de la clinique dentaire et le deuxième est l’évaluation de la satisfaction des patients.


Back